1. Templates
  2. Real Estate
  3. Property Development
  4. New Home Snagging & Handover Form

New Home Snagging & Handover Form

A handover template for developers — room-by-room snags and sign-off captured, so a new home’s defects are logged at handover and put right.

Description

Handover is when a buyer checks their finished new home and flags any snags — the small defects to put right. This form captures a snagging and handover inspection, so issues are logged room by room at the point of handover and the developer’s team can fix them promptly. It works through the home: a table to log each snag by room with a description, the meter readings and keys handed over, and confirmation the demonstration of appliances and systems was given. The buyer notes any outstanding items and signs the handover, so there’s a clear agreed record of the home’s state and what’s owed. Use it on handover day with the buyer. With a clear, thorough tone, it’s free, customizable to your developments, and it embeds on your site or shares as a link, so new-home handovers are documented and snags resolved.

Form fields

Everything the New Home Snagging & Handover Form above collects — 9 fields across 2 pages, so you can see exactly what it captures before you make it your own.

New Home Handover & Snagging

  • Development & plot number

    Short Answer Icon
    Short Answer
  • Snags (room, issue, priority) (room, issue, priority)

    Table Icon
    Table
  • Meter readings (utility, reading) (utility, reading)

    Table Icon
    Table
  • Sets of keys received

    Number Icon
    Number
  • Was the home demonstration given?

    Yes/No Icon
    Yes/No
  • Any outstanding items promised?

    Long Answer Icon
    Long Answer

Buyer sign-off

  • Buyer name

    Name Icon
    Name
  • Handover date

    Date Icon
    Date
  • Email address

    Email Icon
    Email
Use Template Arrow Right Icon

Template FAQs

Common questions about the New Home Snagging & Handover Form — what it captures, when to use it, and how to make it your own.

What is snagging on a new home?

Snagging is identifying the small defects or unfinished details in a new build — a mark on a wall, a door that sticks, a missing seal — so the developer can put them right. It’s done at or soon after handover. This form logs the snags room by room.

What should a snagging handover form include?

A room-by-room list of snags, meter readings, keys handed over, confirmation of the home demonstration, and the buyer’s sign-off. This form captures all of it so the finished state is agreed and the snag list is actioned.

When should I snag a new home?

At or very soon after handover, while you have access and before you’ve filled the home with furniture — fresh eyes catch the most. Some buyers also commission an independent snagging survey. The form gives you a thorough room-by-room record to hand the developer.

What happens to the snags I report?

The developer’s customer care or site team works through the logged list, fixing defects within their timescales under the build warranty. Logging them clearly at handover, as this form does, means nothing is forgotten and you have a record of what was promised.

What is the home demonstration?

It’s where the developer shows you how your new home works — the heating, hot water, appliances, alarms and controls — before you move in. The form confirms this was given so you’re not left guessing, and records keys and meter readings at the same time.

Is the snagging handover form free?

Yes — the form is free with a Fun Forms account, fully customizable to your developments, and it embeds on your website or shares as a link, with no coding needed.